Multiple breaches of procedures at Network Control Centre during period of industrial action
Concern summary
The concerns related to a number of policy and procedure breaches to ensure operational continuity at the Network Control Centre during protected industrial action.
Mode
Rail
Date reported
REPCON number
RR201800011