ARTC Network rules and procedures
Date issue released
Safety Issue Description

ARTC's network rules did not provide suitable guidance to assess continued safe operation when responding to track circuit faults. Additionally, the network rules permitting signals to be passed at Stop did not require a reduction in speed when the condition of the track was unknown.

Issue number
RO-2019-010-SI-03
Transport Function
Rail: Infrastructure
Issue Owner
Australian Rail Track Corporation
Mode of Transport
Rail
Proactive action
Action number
RO-2019-010-NSA-004
Organisation
Australian Rail Track Corporation (ARTC)
Action date
Action Status
Released
Action description

Safety action taken: ARTC has advised that they are currently trialling a process to assist when responding to track circuit faults.

ATSB Response

The ATSB notes that ARTC has implemented a trial for responding to track circuit faults, but this does not contain any references to a reduction in speeds if continuing operation.