Other track inspections
Date issue released
Safety Issue Description

There was no supplementary system of inspection that was effective in identifying rail creep in jointed track. The network placed a high reliance on the asset management system to initiate closer inspection of track potentially affected by creep.

Issue number
RO-2015-022-SI-02
Transport Function
Rail: Infrastructure
Issue Owner
V/Line Pty Ltd
Mode of Transport
Rail
Issue Status Justification

The proactive safety action taken provides the methodology to be used to evaluate the stress condition of rail in instances where there is evidence of creep or incorrect stress. However, there is limited enhancement in the scope of inspection, and there continues to be a high level of reliance on asset management systems to identify rail creep in jointed track. The ATSB recognises that improvements have been made in the asset management systems, as described under safety issues RO-2015-022-SI-01 and RO-2015-022-SI-04.

Proactive action
Action number
RO-2015-022-NSA-036
Organisation
V/Line Pty Ltd
Action date
Action Status
Closed
Action description

V/Line advised that the network standard for the inspection and assessment of lateral stability has been amended to provide specific guidance in respect of joint gap analysis to complement the measure of cumulative creep. Tables and instructions are provided within the standard to evaluate Stress Free Temperature (SFT) through joint gap assessment.