Inconsistency in defining responsibilities for the refuelling of locomotives
Date issue released
Safety Issue Description

The instructions relating to the arranging of refuelling at Parkeston contained in the Pacific National train management plan and the intermodal procedures manual were inconsistent.

Issue number
RO-2013-019-SI-01
Transport Function
Rail: Freight
Issue Owner
Pacific National Pty Ltd
Mode of Transport
Rail
Issue Status Justification

Pacific National has reviewed the relevant procedures for arranging the refuelling of locomotives at Parkeston and removed inconsistencies in instructions contained in the documents.

Proactive action
Action number
RO-2013-019-NSA-052
Organisation
Pacific National Pty Ltd
Action date
Action Status
Closed
Action description

Pacific National has amended the train management plan and the intermodal procedures manual to remove inconsistencies between the instructions and to ensure that any ancillary tasks undertaken by train crew do not have the potential to divert attention away from the safe operation of the train.

The intermodal procedures manual now requires train crews to contact the ISDC prior to arriving at Parkeston with advice of the locomotive/s requiring fuel and the locomotive anticipated fuel level on arrival at Parkeston. This contact is not to interfere with train safe working or to be conducted in a safety critical area.

ATSB Response

Pacific National has reviewed the relevant procedures for arranging the refuelling of locomotives at Parkeston and removed inconsistencies in instructions contained in the documents.