Crossing protection inconsistent with available sighting
Date issue released
Safety Issue Description

The give-way protection installed at the crossing was inconsistent with the available sighting distances on both approaches to the crossing.  Sighting was affected by vegetation, embankments formed by a rail cutting and the curved road approaches. 

Issue number
RO-2013-008-SI-05
Transport Function
Rail: Infrastructure
Issue Owner
V/Line Pty Ltd
Mode of Transport
Rail
Issue Status Justification

The ATSB is satisfied that the interim action taken by V/Line will reduce the risk associated with this safety issue, pending further assessment and infrastructure works.

Recommendation
Action number
RO-2013-008-SR-069
Organisation
V/Line Pty Ltd
Action date
Action Status
Closed
Action description

The Australian Transport Safety Bureau recommends that V/Line reviews the risks at the B. McCann level crossing associated with the inconsistency between the level of crossing protection provided and the sighting available, and takes appropriate action.

Organisation Response
Date Received
Organisation
V/Line
Response Status
Response Text

V/Line has advised the Victorian Railway Crossing Safety Steering committee that B. McCann Road is a high priority location for upgrade to active protection.

Date Received
Organisation
V/Line
Response Status
Response Text

V/Line has introduced interim train speed reductions that will be in place from 1 January 2015 through to 31 March 2015.