The coordinate measuring machine was programmed to measure the location of the oil feed stub pipe interference bore with respect to the manufacturing datum, instead of the design definition datum as specified on both the design and manufacturing stage drawings.
Rolls-Royce advised the ATSB that in July 2008, the design definition and manufacturing stage drawings had been changed to use the inner diameter of oil feed stub pipe as the datum for the oil feed stub pipe counter bore. During March and April 2009 both the manufacturing process and the coordinate measuring machine program were changed to use that revised datum. Use of the original manufacturing datum was discontinued.
The ATSB is satisfied that the action taken by Rolls-Royce adequately addresses this safety issue and therefore makes no recommendation.